Test Management

Our test management for manual and automated tests

prozess automation

expecco ALM was developed for perfect interaction with expecco: Test suites, schedules, test computers, test devices and resources are managed centrally here and test automation is controlled. expecco ALM offers test management for all automation levels: manual, semi-automated and fully automated testing. As a test management system, expecco ALM provides a report for each test run and statistics on the test throughput. It also serves to validate requirements and errors.

arrow

Simple planning and automatic execution despite complex criteria

The greatest strength of expecco ALM lies in test management: the system starts the test sequences according to priority, availability of resources and time overlaps. This means that tests with the highest priority are processed first. The system will always plan and control all test sequences in such a way that as many tests as possible run at the same time, but there are no overlaps. The system always checks fully automatically that the different tests do not block each other. At the same time, however, you always have the option of running individual tests manually. Further information on the automatic planning and utilisation of test resources:
Resource Management


einfache-planung
 

Easy Planning Despite Complex Criteria

Plan and start each of your test runs at various times. In so doing, the availability of the required resources will be taken into consideration by the system.


testablaeufe-im-ueberblick
 

Test procedures at a glance

With expecco ALM, executed test runs can be reproduced and versioned. You can find out the current status and progress of your tests via e-mail, SMS or Jabber notifications.


planungssicherheit
 

Planning Reliability

Um verschiedene Geräte unter den selben Bedingungen zu testen, werden lediglich die Parameter des Tests geändert. Der parametrisierte Testlauf wird als neue Version gespeichert und bleibt in expecco ablauffähig.


automatische-zeitplanung
 

Automated Time Planning

The test processes can be planned and started by the system according to priority and the required resources.


reporting
 

Reporting

A results report is generated after each test run. This is saved in the test centre and assigned to the corresponding test run.

 