Our test management for manual and automated tests
![]() expecco ALM was developed for perfect interaction with expecco: Test suites, schedules, test computers, test devices and resources are managed centrally here and test automation is controlled. expecco ALM offers test management for all automation levels: manual, semi-automated and fully automated testing. As a test management system, expecco ALM provides a report for each test run and statistics on the test throughput. It also serves to validate requirements and errors. |

Simple planning and automatic execution despite complex criteria
The greatest strength of expecco ALM lies in test management: the system starts the test sequences according to priority, availability of resources and time overlaps. This means that tests with the highest priority are processed first. The system will always plan and control all test sequences in such a way that as many tests as possible run at the same time, but there are no overlaps. The system always checks fully automatically that the different tests do not block each other. At the same time, however, you always have the option of running individual tests manually. Further information on the automatic planning and utilisation of test resources:
Resource Management

Easy Planning Despite Complex Criteria
Plan and start each of your test runs at various times. In so doing, the availability of the required resources will be taken into consideration by the system.

Test procedures at a glance
With expecco ALM, executed test runs can be reproduced and versioned. You can find out the current status and progress of your tests via e-mail, SMS or Jabber notifications.

Planning Reliability
Um verschiedene Geräte unter den selben Bedingungen zu testen, werden lediglich die Parameter des Tests geändert. Der parametrisierte Testlauf wird als neue Version gespeichert und bleibt in expecco ablauffähig.

Automated Time Planning
The test processes can be planned and started by the system according to priority and the required resources.

Reporting
A results report is generated after each test run. This is saved in the test centre and assigned to the corresponding test run.